Increasing the Efficiency of Cold Mill Stands

Reliability and efficiency are key components in the cold mill process. When a large Midwest steel supplier approached Superior Engineering with their frustrations, we were pleased to prepare and implement a comprehensive solution.

S/E was asked to investigate (3) separate cold mill stands with the goal to reduce downtime and increase productivity. One key finding was to implement an in-line, auto-backflush and self-cleaning filtration of the cold mill rolling oil solution. This required new pumps + relocations, new filters + housing foundations, the installation of new pipe routings, piping, and wiring. 

In additions to detailed construction bid packages and technical design specifications, S/E supported the project through these tasks:

  • Field investigation and field survey
  • 3D modeling of all large bore piping
  • Spool drawings
  • Stress analysis for piping
  • Project P&ID’s
  • Pipe support and platform drawings
  • Overhead trolley modifications
  • Foundation drawings
  • Electrical and MCC drawings
  • Risk assessment analysis
  • Scheduling services

 Because of the multi-discipline expertise that S/E offers, our client was able to rely on a single engineering firm to see the entire project through to completion. This peace of mind paired with our complete project management made for pleasant experience and successful solution.

See more projects >

Image
We will design the project you and your company deserve with engineering you can trust.
CONTACT US